Nothing
#' @name toluca
#' @title Toluca Company data
#' @description Toluca Company data in Applied Linear
#' Statistical Models, 5th edition, p. 19. From the book:
#'
#' The Toluca Company manufactures refrigeration equipment
#' as well as many replacement parts. In the past, one of
#' the replacement parts has been produced periodically in
#' lots of varying sizes. When a cost improvement program
#' was undertaken, company officials wished to determine
#' the optimum lot size for producing this part. The
#' production of this part involves setting up the
#' production process (which must be done no matter what
#' is the lot size) and machining and assembly operations.
#' One key input for the model to ascertain the optimum
#' lot size was the relationship between lot size and
#' labor hours required to produce the lot. To determine
#' this relationship, data on lot size (\code{lot_size})
#' and work hours (\code{work_hours}) for 25 recent
#' production runs were utilized.
#' @author Joshua P. French
#' @usage data(toluca)
#' @format A data frame with 25 observations and 2 variables:
#' \describe{
#' \item{\code{lot_size}}{Number of replacement parts produced in the lot.}
#' \item{\code{work_hours}}{Number of hours of work required to produce the lot.}
#' }
#' @references
#' Kutner, M. H., Nachtsheim, C. J., Neter, J., & Li, W. (2004). Applied Linear Statistical Models, 5th edition. New York: McGraw-Hill/Irwin.
#' @keywords data
NULL
Any scripts or data that you put into this service are public.
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.