PerformanceMetric: Performance Metrics Methods

Description Usage Arguments Details Value Note Examples

Description

Performance metric (PMs) methods for your management strategy evaluation.

Usage

 1
 2
 3
 4
 5
 6
 7
 8
 9
10
11
12
13
14
15
16
17
P10(MSEobj = NULL, Ref = 0.1, Yrs = NULL)

P50(MSEobj = NULL, Ref = 0.5, Yrs = NULL)

P100(MSEobj = NULL, Ref = 1, Yrs = NULL)

PNOF(MSEobj = NULL, Ref = 1, Yrs = NULL)

LTY(MSEobj = NULL, Ref = 0.5, Yrs = -10)

STY(MSEobj = NULL, Ref = 0.5, Yrs = 10)

Yield(MSEobj = NULL, Ref = 1, Yrs = NULL)

AAVY(MSEobj = NULL, Ref = 0.2, Yrs = NULL)

AAVE(MSEobj = NULL, Ref = 0.2, Yrs = NULL)

Arguments

MSEobj

An object of class MSE

Ref

Reference point for calculating the performance metric. See details.

Yrs

Numeric vector of length 2 with year indices to summarize performance. If NULL, the performance is summarized over all projection years.

Details

Performance Metric definitions:

P10 Probability B > 0.1 BMSY
P50 Probability B > 0.5 BMSY
P100 Probability B > BMSY
PNOF Probability F < FMSY
LTY Probability Long-Term Yield > 0.5 Relative Yield
STY Probability Short-Term Yield > 0.5 Relative Yield
AAVY Probability AAVY < 0.2 (Average Annual Variability in Yield)
AAVE Probability AAVE < 0.2 (Average Annual Variability in Effort)
Yield Average Yield (relative to Reference Yield)

Argument Ref provides the ratio relative to the reference point for calculating the performance metric. For biomass-based PMs (P10, P50, P100), this is the fraction of BMSY. For PNOF, the fraction of FMSY. For Yield (and LTY/STY), the fraction of the Reference Yield. For AAVY is it the maximum acceptable variability in yield (i.e, default for AAVY is Ref=0.2)

The Yrs argument defines the number of years to calculate the performance statistic over. A value of NULL, the default for AAVY, AAVE, P10, P50, P100, and PNOF, means that the performance metric is calculated over all projection years. A numeric vector of length two is used to specify the first and last year, e.g, if Yrs=c(1,10) the performance statistic is calculated over the first 10 projection years. A numeric vector of length one with positive or negative value respectively can be used to specify the first x or last x years, e.g, Yrs=10 is first 10 years, and Yrs=-10 is the last 10 years. See ChkYrs for more details.

By default Long-Term Yield (LTY) is the Yield in the last ten years of the projection period in the MSE, and Short-Term Yield (STY) is that in the first 10 years of the projection period.

Value

An object of class PMobj

Note

See relevant section of the DLMtool User Guide for more information.

Examples

 1
 2
 3
 4
 5
 6
 7
 8
 9
10
11
12
13
## Not run: 
myMSE <- runMSE()
P10(myMSE)
P50(myMSE)
P100(myMSE)
PNOF(myMSE)
LTY(myMSE)
STY(myMSE)
AAVY(myMSE)
AAVE(myMSE)
Yield(myMSE)

## End(Not run)

DLMtool/DLMtool documentation built on June 20, 2021, 5:20 p.m.