| allocation-methods | Tidy and glance methods for allocations |
| as_frame | Turn a spatial object into a frame |
| as_sf | Put results back on the geometries of a spatial frame |
| as_svydesign | Hand a sample to the survey package |
| autoplot.fieldopt_frontier | Plot the cost-variance frontier |
| autoplot.fieldopt_routes | Plot the routes |
| autoplot.fieldopt_sample | Plot a sample of units |
| autoplot.fieldopt_schedule | Plot a field schedule |
| core_version | Version of the Rust engine |
| cost_variance_frontier | Cost-variance frontier of a design by simulation |
| design_variance | Design-based estimate of a total with its variance |
| dual_frame_allocation | Dual-frame allocation (area frame plus list frame with... |
| dual_frame_design | Dual-frame allocation with the area-frame cost taken from the... |
| dual_frame_estimator | Dual-frame estimate of a total |
| expected_hits | Expected number of point hits of each establishment |
| field_cost_model | Field cost model |
| fieldopt-package | fieldopt: Area-Frame and Dual-Frame Survey Design under Real... |
| frame_allocation | Cost-aware allocation across strata |
| frame_overlap | Overlap between a list frame and the area frame |
| multivariate_allocation | Cost-aware allocation for several study variables |
| point_design_effect | Design effect and bias of point sampling by simulation |
| point_estimator | Multiplicity (point) estimator of a total from an area sample... |
| ratio_estimator | Ratio estimate of a total with an auxiliary variable |
| read_areaframe | Read the cells of an area frame exported by the areaframe... |
| reexports | Objects exported from other packages |
| routed_cost_curve | Routed cost curve of a design: the travel constant of Hansen,... |
| routed_unit_cost | Field cost per sampled unit at a given sample size, from the... |
| route_fieldwork | Route the field work |
| routes-methods | Tidy and glance methods for routes and frontiers |
| sampled | The sampled units of a sample |
| schedule_calendar | Redistribute the routes of a schedule over teams and days... |
| schedule_fieldwork | Schedule the field work of several teams from several bases |
| segment_estimator | Segment estimators of a total from an area sample of segments |
| select_points | Select points inside sampled grid cells |
| select_units | Select units with a spatially balanced or systematic... |
| spatial_balance | Spatial balance of a sample |
| travel_matrix | Travel matrix between the units of a frame |
| two_stage_allocation | Two-stage allocation with a field cost function |
| two_stage_design | Two-stage allocation with the primary-unit cost taken from... |
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.