future.apply: future.apply: Apply Function to Elements in Parallel using...

future.applyR Documentation

future.apply: Apply Function to Elements in Parallel using Futures

Description

The future.apply packages provides parallel implementations of common "apply" functions provided by base R. The parallel processing is performed via the future ecosystem, which provides a large number of parallel backends, e.g. on the local machine, a remote cluster, and a high-performance compute cluster.

Details

Currently implemented functions are:

  • future_apply(): a parallel version of apply()

  • future_by(): a parallel version of by()

  • future_eapply(): a parallel version of eapply()

  • future_lapply(): a parallel version of lapply()

  • future_mapply(): a parallel version of mapply()

  • future_sapply(): a parallel version of sapply()

  • future_tapply(): a parallel version of tapply()

  • future_vapply(): a parallel version of vapply()

  • future_Map(): a parallel version of Map()

  • future_replicate(): a parallel version of replicate()

  • future_.mapply(): a parallel version of .mapply()

Reproducibility is part of the core design, which means that perfect, parallel random number generation (RNG) is supported regardless of the amount of chunking, type of load balancing, and future backend being used.

Since these ⁠future_*()⁠ functions have the same arguments as the corresponding base R function, start using them is often as simple as renaming the function in the code. For example, after attaching the package:

library(future.apply)

code such as:

x <- list(a = 1:10, beta = exp(-3:3), logic = c(TRUE,FALSE,FALSE,TRUE))
y <- lapply(x, quantile, probs = 1:3/4)

can be updated to:

y <- future_lapply(x, quantile, probs = 1:3/4)

The default settings in the future framework is to process code sequentially. To run the above in parallel on the local machine (on any operating system), use:

plan(multisession)

first. That's it!

To go back to sequential processing, use plan(sequential). If you have access to multiple machines on your local network, use:

plan(cluster, workers = c("n1", "n2", "n2", "n3"))

This will set up four workers, one on n1 and n3, and two on n2. If you have SSH access to some remote machines, use:

plan(cluster, workers = c("m1.myserver.org", "m2.myserver.org))

See the future package and future::plan() for more examples.

The future.batchtools package provides support for high-performance compute (HPC) cluster schedulers such as SGE, Slurm, and TORQUE / PBS. For example,

  • plan(batchtools_slurm): Process via a Slurm scheduler job queue.

  • plan(batchtools_torque): Process via a TORQUE / PBS scheduler job queue.

This builds on top of the queuing framework that the batchtools package provides. For more details on backend configuration, please see the future.batchtools and batchtools packages.

These are just a few examples of parallel/distributed backend for the future ecosystem. For more alternatives, see the 'Reverse dependencies' section on the future CRAN package page.

Author(s)

Henrik Bengtsson, except for the implementations of future_apply(), future_Map(), future_replicate(), future_sapply(), and future_tapply(), which are adopted from the source code of the corresponding base R functions, which are licensed under GPL (>= 2) with 'The R Core Team' as the copyright holder. Because of these dependencies, the license of this package is GPL (>= 2).

See Also

Useful links:


future.apply documentation built on Oct. 28, 2024, 1:06 a.m.