mae,Forecast-method | R Documentation |
mae
takes a Forecast
object and returns the MAE of the
forecast. MAE is calculated as:
1/length(forecast) * sum(abs(forecast - realized))
## S4 method for signature 'Forecast'
mae(Forecast)
Forecast |
Forecast object. |
MAE value.
my_forecast <- Forecast(
origin = as.Date(c("2010-03-31", "2010-06-30", "2010-09-30", "2010-12-31")),
future = as.Date(c("2011-03-31", "2011-06-30", "2011-09-30", "2011-12-31")),
forecast = c(4.21, 4.27, 5.32, 5.11),
realized = c(4.40, 4.45, 4.87, 4.77),
h_ahead = 4L
)
mae(my_forecast)
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.