proportional | R Documentation |
These functions provide various proportional tests for messy date objects.
e1 %l% e2
## S3 method for class 'mdate'
e1 %l% e2
e1 %g% e2
## S3 method for class 'mdate'
e1 %g% e2
e1 %ge% e2
## S3 method for class 'mdate'
e1 %ge% e2
e1 %le% e2
## S3 method for class 'mdate'
e1 %le% e2
e1 %><% e2
## S3 method for class 'mdate'
e1 %><% e2
e1 %>=<% e2
## S3 method for class 'mdate'
e1 %>=<% e2
e1 , e2 |
|
The proportion that the comparison is true.
A logical vector the same length as the mdate
passed.
%l%
: Tests proportion of dates in the first vector
that precede the minimum in the second vector.
%g%
: Tests proportion of dates in the first vector
that follow the maximum in the second vector.
%ge%
: Tests proportion of dates in the first vector
that follow or are equal to the maximum in the second vector.
%le%
: Tests proportion of dates in the first vector
that precede or are equal to the minimum in the second vector.
%><%
: Tests proportion of dates in the first vector
that are between the minimum and maximum dates in the second vector.
%>=<%
: Tests proportion of dates in the first vector that
are between the minimum and maximum dates in the second vector, inclusive.
as_messydate("2012-06") < as.Date("2012-06-02")
as_messydate("2012-06") %l% as_messydate("2012-06-02")
as_messydate("2012-06") > as.Date("2012-06-02")
as_messydate("2012-06") %g% as_messydate("2012-06-02")
as_messydate("2012-06") >= as.Date("2012-06-02")
as_messydate("2012-06") %ge% as_messydate("2012-06-02")
as_messydate("2012-06") <= as.Date("2012-06-02")
as_messydate("2012-06") %le% "2012-06-02"
as_messydate("2012-06") %><% as_messydate("2012-06-15..2012-07-15")
as_messydate("2012-06") %>=<% as_messydate("2012-06-15..2012-07-15")