Calculates the one-day Value at Risk (VaR) and Expected Shortfall (ES) of the returns from the predictive
distribution of y_t given y_1, ..., y_{t-1}, for every observation and for the next day after the
data.
var_es(object, level = c(0.95, 0.99), grid_size = 500)
object |
A |
level |
Vector of confidence levels between 0.5 and 1. |
grid_size |
Number of grid points for the log-volatility. |
The predictive distribution is calculated exactly with the same filter on a grid for the log-volatility as
residuals.stochvolTMB. It is a mixture over h_t of the conditional distribution of the
returns. For a level \alpha, for example 0.99, let q_t be the 1 - \alpha quantile of the predictive
distribution. Then
VaR_t = -q_t, \qquad ES_t = -E[y_t \mid y_t \le q_t, y_1, \ldots, y_{t-1}].
Both are reported as positive numbers when they are losses, on the scale of the returns. A return is an exceedance
if y_t < -VaR_t.
The parameters are fixed at their estimates from the full data, and the uncertainty of the parameters is not
included. The values for the observed data are therefore in-sample, and a backtest with
backtest_var on them is slightly optimistic. The last row (time = nobs + 1) is the forecast
for the next day. For more than one day, use forecast_var_es.
A data.table with one row for each time point and level, and the columns time (1 to
nobs + 1), level, y (the observed return, NA for the forecast), var, es
and exceedance (y < -var).
backtest_var, forecast_var_es
opt <- estimate_parameters(spy$log_return, model = "skew_t_leverage", silent = TRUE)
risk <- var_es(opt, level = c(0.95, 0.99))
# Forecast for the next day
risk[is.na(y)]