Description Usage Format Examples
Dataset PM10
, truncated from the left at variable value PM10 = 2 (8 percent truncation).
1 |
A data frame with 460 observations on the following 8 variables.
PM10
Hourly values of the logarithm of the concentration of PM10 (particles). Left-truncated at point 2.
cars
The logarithm of the number of cars per hour
temp
Temperature 2 meters above ground (degree C)
wind.speed
Wind speed (meters/second)
temp.diff
The temperature difference between 25 and 2 meters above ground (degree C)
wind.dir
Wind direction (degrees between 0 and 360)
hour
Hour of day
day
Day number from October 1. 2001
1 |
Loading required package: truncreg
Loading required package: maxLik
Loading required package: miscTools
Please cite the 'maxLik' package as:
Henningsen, Arne and Toomet, Ott (2011). maxLik: A package for maximum likelihood estimation in R. Computational Statistics 26(3), 443-458. DOI 10.1007/s00180-010-0217-1.
If you have questions, suggestions, or comments regarding the 'maxLik' package, please use a forum or 'tracker' at maxLik's R-Forge site:
https://r-forge.r-project.org/projects/maxlik/
Loading required package: boot
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.