OREngines_CM: Maintenance times and types of off road engines (with PM...

OREngines_CMR Documentation

Maintenance times and types of off road engines (with PM renewing assumption)

Description

This data set refers to 141 diesel engines of trucks used in Brazilian mining. Failure times and planned PM times are recorded in working hours. 208 failure times and 52 PM times were recorded. Similarly to what has been done by M.L.G. de Toledo et al., PM are supposed to renew the corresponding system. The data set is then transformed in a sample of 191 sequences of event times (191=141+52-2: 141 systems, 52 AGAN PM and 2 systems with only 1 PM). This data set does not exactly corresponds to the one used by M.L.G. de Toledo et al.. In fact, in their paper the authors have made some little typos when they have transformed the original data set. This data set corresponds to the correct data set transformation.

Usage

OREngines_CM

Format

A data frame with 191 lines and 3 columns. Each line corresponds to an event. For each event, the columns System, Time and Type represent respectively the corresponding trajectory (an integer between 1 and 191), the times and the type (-1 for a CM).

References

M.L.G. de Toledo, M.A. Freitas, E.A. Colosimo and L.G. Gilardoni (2016), "Optimal periodic maintenance policy under imperfect repair: A case study on the engines of off-road vehicles",IIE Transactions 48(8), pp. 747-758.

See Also

OREngines for the original data set with PM times. OREngines2_CM for the data set studied by M.L.G. de Toledo et al..


rcqls/VAM documentation built on Jan. 14, 2024, 9:07 p.m.