##' Stockpile dust generation
##'
##' A function to estimate dust generation from stockpile in quarry.
##'
##' @param quarryInput data frame containing column names: quarryProduction - quarry production tonne per hour,
##' blastingFreq - blasting frequency per month, areaBlasted - area blasted (km. sq), blasthole - average of depth of blast hole (m), drillhole - drilling hole per month,
##' moisture - percentage of moisture content, silt - percentage of silt content, unpavedDist - unpaved road distant (KM), pavedDist - unpaved road distance (KM),
##' unpavedVehicle - number of vehicle count travel using unpaved road per month, pavedVehicle - number of vehicle count travel using unpaved road per month,
##' nPrimary - number of primary crusher, nSecondary - number of secondary crusher, nTertiary - number of tertiary crusher, nScreen - number of screen.
##' @param particleSize particle size of dust deposited rate. The default value is "tsp" for total suspended solid
##' and other available particle size is "pm10" for particulate matter <10 micron.
##' @param QuarryProduction Numeric value for quarry production tonne per hour.
##' @param moistureContent Percentage of soil moisture content, use the default to read moisture value inside quarryInput dataframe
##'
##' @export
##'
##' @author Zul Fadhli & Dr. Izhar Abadi
##'
##' @examples
##' #demo
##' stockpile <- function(quarryInput, particleSize = "tsp")
stockpile <- function(quarryInput, particleSize = "tsp", QuarryProduction = quarryInput$quarryProduction,
mositure = quarryInput$moisture)
{
quarryInput <- quarryInput
if(particleSize == "tsp") {
ks = 0.74
}else if (particleSize == "pm10"){
ks = 0.35
}
avgws <- mean(windInput$ws)
(ks*0.0016*((avgws/2.2)^1.3)/((mositure/2)^1.4))*QuarryProduction*8*26*12/1000
}
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.