View source: R/ss_buc_paired_t.R
| ss_buc_paired_t | R Documentation |
ss_buc_paired_t returns the necessary sample size (the
number of pairs) to achieve a desired level of statistical power for a
planned study using a dependent t test, based on information obtained
from a previous study. The effect from the previous study can be corrected
for publication bias and/or uncertainty to provide a sample size that will
achieve more accurate statistical power for a planned study, when compared
to approaches that use a sample effect size at face value or rely on sample
size only. The bias and uncertainty adjusted previous study noncentrality
parameter is also returned, together with the planning effect size, the
effect size the plan is built on, as a standardized mean of the paired
differences (Cohen's d_z).
ss_buc_smd_paired is an alias for ss_buc_paired_t: the two are
the same function. The paired t test and the standardized mean
difference of the difference scores describe the same comparison, so the
same planner serves both framings. Prefer the test-specific name
(ss_buc_paired_t) when the prior t was computed from raw
(unstandardized) data, since the planner works directly from the observed
t.
ss_buc_paired_t(
t_observed,
N,
alpha_prior = 0.05,
alpha_planned = 0.05,
assurance = 0.8,
desired_power = 0.8
)
ss_buc_smd_paired(
t_observed,
N,
alpha_prior = 0.05,
alpha_planned = 0.05,
assurance = 0.8,
desired_power = 0.8
)
t_observed |
Observed t value from a previous study used to plan sample size for a planned study. Either sign is accepted: the publication rule is two-sided, so only the magnitude enters the correction (see Details). |
N |
Total sample size (the number of pairs) of the previous study. |
alpha_prior |
The significance level |
alpha_planned |
Alpha level |
assurance |
Desired level of assurance: the long run proportion of
planned studies whose statistical power at the true effect reaches or
surpasses |
desired_power |
Desired level of statistical power for the planned
study: the probability that its test rejects the null hypothesis when
the effect is present (Maxwell, Delaney, & Kelley, 2027). It must exceed
|
Researchers often use the sample effect size from a prior study as an estimate of the likely size of an expected future effect in sample size planning. However, sample effect size estimates should not usually be used at face value to plan sample size, due to both publication bias and uncertainty.
The approach implemented in ss_buc_paired_t uses the observed
t value and sample size from a previous study to correct the
noncentrality parameter associated with the effect of interest for
publication bias and/or uncertainty. This new estimated noncentrality
parameter is then used to calculate the necessary sample size to achieve
the desired level of power in the planned study.
The approach uses a likelihood function of a truncated noncentral F distribution, where the truncation occurs due to small effect sizes being unobserved due to publication bias. The numerator of the likelihood function is the density of a noncentral F distribution. The denominator is the power of the test, which serves to truncate the distribution. In the two-group case, this formula reduces to the density of a truncated noncentral t distribution. (See Taylor & Muller, 1996, Equation 2.1; Anderson, Kelley, & Maxwell, 2017, Equation 3; and Anderson & Maxwell, 2017, for more details.)
Assurance is the proportion of times that power will be at or above the
desired level, if the experiment were to be reproduced many times. For
example, assurance = .5 means that power will be above the desired
level half of the time, but below the desired level the other half of the
time. Selecting assurance = .5 (selecting the noncentrality
parameter at the 50th percentile of the likelihood distribution) results in
a median unbiased estimate of the population noncentrality parameter and
does not correct for uncertainty. In order to correct for uncertainty,
assurance > .5 can be selected, which corresponds to selecting the
noncentrality parameter associated with the (1 - assurance) quantile of the
likelihood distribution.
alpha_prior is the significance level a prior result had to reach
to be published: the correction assumes that only results with p
values below alpha_prior reach the literature, and so reach you.
Different \alpha levels represent differing amounts of publication
bias. For example, setting alpha_prior = .20 assumes that studies
with p values less than .20 are published, whereas those with
larger p values are not, which reflects less severe publication
bias than the default of .05. If the previous study of interest has not
been subjected to publication bias (e.g., a pilot study), set
alpha_prior = 1, which may also be written
alpha_prior = "No Publication Filter"; Anderson, Kelley, and
Maxwell (2017, p. 1552) note that it can be set equal to 1 when
publication bias is thought not to apply. Because no p value
exceeds 1, this means no publication filter at all: any result would
have been published whatever its p value, so there is no
publication bias to correct, and only the correction for uncertainty,
set by assurance, remains.
In some cases, the corrected noncentrality parameter for a given level of
assurance will be estimated to be zero. This is an indication that, at the
desired level of assurance, the previous study's effect cannot be
accurately estimated due to high levels of uncertainty and bias. When this
happens, subsequent sample size planning is not possible with the chosen
specifications, and the function stops with an informative error rather
than returning a result. The error reports the largest assurance the prior
result can support, which is 1 - p/\alpha, where
p is the prior study's p value and \alpha is
alpha_prior; at any higher assurance the corrected noncentrality
parameter is driven to zero. Two remedies are available. First, users can
select a lower value of assurance (e.g., .8 instead of .95), at or below
the reported ceiling. Second, users can reduce the influence of publication
bias by setting alpha_prior at a value greater than .05, which raises
the ceiling. Note that alpha_prior is not a property of the prior
study, which is fixed, but the analyst's assumption about the publication
threshold its literature faced. When the ceiling is at or below the
recommended floor of .5, lowering assurance cannot help and
alpha_prior is the only remaining lever. It is possible to correct
for uncertainty only by setting alpha_prior = 1 and choosing the
desired level of assurance. We encourage users to make the adjustments as
minimal as possible.
The returned actual_power is the statistical power of the plan
this function reports: the power of a study of the returned sample size
when the effect is the returned bias and uncertainty adjusted
noncentrality parameter. Because a sample size must be a whole number,
actual_power is never below the desired_power that was
requested and is usually a little above it.
The observed t may be entered with either sign. The publication
rule the correction assumes is two-sided and the truncated likelihood
is symmetric in the sign of t, so only the magnitude enters the
computation: t_observed = -3 plans exactly the sample size that
t_observed = 3 plans. The sign of a paired t records the
direction the within-pair difference was taken, an arbitrary coding
choice rather than evidence. When planning a replication, confirm that
the magnitude belongs to an effect in the direction the planned study
is designed to detect (Anderson & Kelley, 2024): the correction
adjusts the size of the prior effect, not its direction.
If you are working from a standardized mean difference of the difference
scores (Cohen's d_z, defined under Value) rather than a
t statistic, convert it before calling: for a paired design
t = d_z\sqrt{N}, where N is the number of
pairs.
An object of class bucss_plan: a data.frame with a
character term column and a numeric value column, in the
same shape as the sibling package DMAR's planners. The design
results come first: the necessary number of pairs for the planned
study, named for its unit (necessary_n_per_group,
necessary_n_per_cell, or necessary_N); for the per-group
and per-cell designs, total_N, the implied total sample size;
actual_power, the power of the plan returned, that is, of the
returned sample size at the returned noncentrality parameter (see
Details); ncp_adjusted, the publication bias and uncertainty
adjusted prior study noncentrality parameter, on the scale of the t statistic (the noncentrality parameter of the prior study's noncentral t); and the
planning effect size, dz_planning, Cohen's (1988) d_z (a magnitude): the mean of the paired differences divided by the standard deviation of those differences, the subscript z naming the difference score (Cohen writes Z = X - Y); here \lambda/\sqrt{N}, where \lambda is ncp_adjusted and N the prior number of pairs.
A planning effect size (the row whose name ends in _planning) is
an adjusted effect size: the value, in the design's usual effect size
metric, used to plan the sample size given the situation at hand (the
prior study's result, the publication bias assumed through
alpha_prior, and the uncertainty allowed for through
assurance). It is ncp_adjusted restated in that metric
and is what the plan is built on, not an estimate of the population
effect to report: above an assurance of .5 it is deliberately
conservative (a lower confidence limit), and at .5 it is the median
unbiased estimate. Because it restates ncp_adjusted,
actual_power is the ordinary power of a study of the returned
sample size when the population effect is the planning effect size.
Rows echoing the planning inputs follow the design results, so the
assumptions travel with the result. The design, the unit the sample size
is counted in, the largest assurance this prior can support (the assurance
ceiling), and the planned test's degrees of freedom (df_effect, and
df_error where the test has a denominator) travel on attributes.
print.bucss_plan shows the design, for the regression planners the
predictor frame, the unit, and the ceiling beneath the table;
tidy() and glance() give the compact and wide views, the
latter with every attribute as a column.
Ken Kelley (kkelley@nd.edu) and Samantha F. Anderson (samantha.f.anderson@asu.edu)
Anderson, S. F., & Kelley, K. (2024). Sample size planning for replication studies: The devil is in the design. Psychological Methods, 29, 844–867. \Sexpr[results=rd]{tools:::Rd_expr_doi("10.1037/met0000520")}
Anderson, S. F., Kelley, K., & Maxwell, S. E. (2017). Sample-size planning for more accurate statistical power: A method adjusting sample effect sizes for publication bias and uncertainty. Psychological Science, 28, 1547–1562. \Sexpr[results=rd]{tools:::Rd_expr_doi("10.1177/0956797617723724")}
Anderson, S. F., & Maxwell, S. E. (2017). Addressing the "replication crisis": Using original studies to design replication studies with appropriate statistical power. Multivariate Behavioral Research, 52, 305–324. \Sexpr[results=rd]{tools:::Rd_expr_doi("10.1080/00273171.2017.1289361")}
Kelley, K., & Maxwell, S. E. (2003). Sample size for multiple regression: Obtaining regression coefficients that are accurate, not simply significant. Psychological Methods, 8, 305–321. \Sexpr[results=rd]{tools:::Rd_expr_doi("10.1037/1082-989X.8.3.305")}
Maxwell, S. E., Delaney, H. D., & Kelley, K. (2027). Designing experiments and analyzing data: A model comparison perspective (4th ed.). Routledge.
Taylor, D. J., & Muller, K. E. (1996). Bias in linear model power and sample size calculation due to estimating noncentrality. Communications in Statistics: Theory and Methods, 25, 1595–1610. \Sexpr[results=rd]{tools:::Rd_expr_doi("10.1080/03610929608831787")}
Cohen, J. (1988). Statistical power analysis for the behavioral sciences (2nd ed.). Lawrence Erlbaum Associates.
result <- ss_buc_paired_t(t_observed = 3, N = 40, alpha_prior = .05,
alpha_planned = .05, assurance = .80, desired_power = .80)
result
# ss_buc_smd_paired is the same function under an effect size name
ss_buc_smd_paired(t_observed = 3, N = 40)
# Requesting more assurance than the prior result can support stops with an
# informative error naming the largest workable assurance (here near .90):
try(ss_buc_paired_t(t_observed = 3, N = 40, assurance = .95))
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.