Description Usage Arguments See Also Examples
WW
implements the Wagner-Whitin algorithm. Considering time-varying demand, the algorithm builds production
plans that minimizes the total setup and holding costs in a finite horizon of time, assuming zero starting inventory
and no backlogging
1 |
x |
A numeric vector containing the demand per unit time |
a |
A numeric number for the set-up cost per unit and period |
h |
A numeric number for the holding cost per unit and period |
method |
Character string specifing which algorithm to use: "backward" (default) or "forward" |
EOQ, EPQ, newsboy
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 | ## Not run:
# Example from Hiller, p.952, reproduced bellow:
# An airplane manufacturer specializes in producing small airplanes. It has just received
# an order from a major corporation for 10 customized executive jet airplanes for the use of
# the corporation's upper management. The order calls for three of the airplanes to be delivered
# (and paid for) during the upcoming winter months (period 1), two more to be delivered during
# the spring (period 2), three more during the summer (period 3), and the final two during the fall
# (period 4). Setting up the production facilities to meet the corporation's specifications for
# these airplanes requires a setup cost of $2 million.
# The manufacturer has the capacity to produce all 10 airplanes within a couple of months, when the
# winter season will be under way. However, this would necessitate holding seven of the airplanes in
# inventory, at a cost of $200,000 per airplane per period, until their scheduled delivery times
# (...) Management would like to determine theleast costly production schedule for filling
# this order.
## End(Not run)
x <- c(3,2,3,2)
a <- 2
h <- 0.2
WW(x,a,h,method="backward")
## Not run:
# The total variable cost is $4.8 million (minimum value in the first raw). Since we have two
# minimun values in the first raw (positions 2 and 4), we have the following solutions:
# Solution 1: Produce to cover demand until period 2, 5 airplanes. In period 3, new decision,
# minimun value 2.4 in period 4 (third raw). Then in period 3 produce to cover demand until
# period 4, 5 airplanes.
# Solution 2: Produce to cover demand until period 4, 10 airplanes.
## End(Not run)
WW(x,a,h,method="forward")
## Not run:
#The total variable cost is $4.8 million (minimum value in the last raw). Since we have two minimun
# values in columns 1 and 3, the solutions are:
# Solution 1: Produce in period 1 to cover demand until period 4, 10 airplanes.
# Solution 2: Produce in period 3 to cover demand until period 4, 5 airplanes.In period 2, new
# decision, minimun value 2.4 in raw 3. Then in period 1 produce to cover demand until
# period 2, 5 airplanes.
## End(Not run)
|