Man pages for aemo
Download Australian Energy Market Operator Data

aemo_bidsGenerator bid stack
aemo_cache_infoInspect the local aemo cache
aemo_clear_cacheClear the aemo cache
aemo_constraintsBinding transmission and system constraints
aemo_demandRegional electricity demand
aemo_dispatch_unitsPer-DUID dispatch output
aemo_dlfDistribution Loss Factors (DLF) by connection point
aemo_fcasFrequency control ancillary services (FCAS) prices
aemo_fcas_enablementFCAS enablement volumes by generator unit
aemo_gasGas market data (STTM, DWGM)
aemo_genconGeneric constraint equations and RHS terms (GENCONDATA)
aemo_interconnectorNEM interconnector flows
aemo_interconnectorsNEM interconnectors
aemo_market_noticesNEM market notices
aemo_mlfMarginal Loss Factors (MLF) by DUID and financial year
aemo_nemweb_downloadDownload a NEMweb zipped CSV to the local cache
aemo_nemweb_lsList files in a NEMweb directory
aemo_outagesPlanned and forced network outages
aemo-packageaemo: Australian Energy Market Operator Data
aemo_participantsNEM market participants and their registered DUIDs
aemo_pasaProjected Assessment of System Adequacy (PASA)
aemo_predispatchPrice and demand forecasts (P5MIN, PREDISPATCH)
aemo_priceWholesale electricity prices
aemo_price_capsNEM market price caps, price floor, and CPT by financial year
aemo_regionsNEM regions
aemo_rooftop_pvRooftop PV actuals and forecasts
aemo_settlementSettlement cash-flow and residue tables
aemo_snapshotSnapshot provenance for an aemo_tbl
aemo_spd_constraintsSPD constraint tables (regions, interconnectors, connection...
aemo_throttleConfigure request throttling
aemo_unitsNEM generators (DUID registry)
print.aemo_tblPrint an aemo_tbl
aemo documentation built on April 29, 2026, 1:07 a.m.