| aemo_interconnectors | R Documentation |
Returns a static table of the seven NEM interconnectors. The seventh entry is Project EnergyConnect (PEC), whose Stage 1 was energised on 30 April 2025 with full ~800 MW capability expected mid-2026.
aemo_interconnectors()
An aemo_tbl with columns interconnector_id,
from_region, to_region, name, energised.
Other reference:
aemo_dlf(),
aemo_mlf(),
aemo_participants(),
aemo_price_caps(),
aemo_regions(),
aemo_settlement(),
aemo_snapshot(),
aemo_units()
aemo_interconnectors()
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.