critpath: Setting the Critical Path in Project Management

Solving the problem of project management using CPM (Critical Path Method), PERT (Program Evaluation and Review Technique) and LESS (Least Cost Estimating and Scheduling) methods. The package sets the critical path, schedule and Gantt chart. In addition, it allows to draw a graph even with marked critical activities. For more information about project management see: Taha H. A. "Operations Research. An Introduction" (2017, ISBN:978-1-292-16554-7), Rama Murthy P. "Operations Research" (2007, ISBN:978-81-224-2944-2), Yuval Cohen & Arik Sadeh (2006) "A New Approach for Constructing and Generating AOA Networks", Journal of Engineering, Computing and Architecture 1. 1-13, Konarzewska I., Jewczak M., Kucharski A. (2020, ISBN:978-83-8220-112-3), Miszczyńska D., Miszczyński M. "Wybrane metody badań operacyjnych" (2000, ISBN:83-907712-0-9).

Package details

AuthorAdam Kucharski
MaintainerAdam Kucharski <aqcharski@interia.pl>
LicenseGPL-2
Version0.2.2
Package repositoryView on CRAN
Installation Install the latest version of this package by entering the following in R:
install.packages("critpath")

Try the critpath package in your browser

Any scripts or data that you put into this service are public.

critpath documentation built on May 29, 2024, 2:13 a.m.