get_PEC_porewater: Predicted pore water concentration

View source: R/fcr_PEC.R

get_PEC_porewaterR Documentation

Predicted pore water concentration

Description

Average predicted environmental concentration (PEC) over d days after fertilizer application. The Calculation is based on the FCR prepared Monte Carlo table

Usage

get_PEC_porewater(p, d)

Arguments

p

Parameter table created with oneYear_matrix() and extended with add_variables()

d

The number of days after fertilizer application. Somewhere between 1 and the number of days of the growing period, since plant uptake is considered

Value

Numeric vector of concentrations per field in µg/L


KWB-R/kwb.fcr documentation built on Nov. 14, 2023, 5:17 a.m.