get_c_i_from_PNEC_porewater: Calculate the initial concentration in soil for RQ porewater...

View source: R/fcr_PEC.R

get_c_i_from_PNEC_porewaterR Documentation

Calculate the initial concentration in soil for RQ porewater = 1

Description

The initial soil concentration is calculated so that the average concetrantion of the first 30 days leads to a PEC_water that equals the PNEC water

Usage

get_c_i_from_PNEC_porewater(dat, info, nFields)

Arguments

dat

List with all the input variables. This list is produced by function read_fcr_input() from the Excel sheets.

info

he table containing additional substance information loaded with read_fcr_input()

nFields

Number of Monte Carlo cycles

Details

The equation is a combination of the definition for PEC soil and PEC porewater the from TGD, back-calculating to c0.

Value

Numeric vector of lenght nFields, containig the initial concentrations in µg/L


KWB-R/kwb.fcr documentation built on Nov. 14, 2023, 5:17 a.m.