Description Usage Arguments Value Examples
Flood generating process is calculated as as the fraction of flood runoff casued by rain (0-1) for a set of identified flood events. For each flood events, the sum of rain and snow melt is caclulated for a time window given as the sum of concentration time and recession in front of the flood event. The FGP method is described closer in Vormoor et al, 2016. 10.06.2016, LESC (lena schlichting) Extracting flood generating process as the fraction of flood runoff casued by rain (0-1) for a list of floods specified by dates for one station
1 | get_fgp(cfloods, crain, csnow, cdates, ctime = 2, rtime = 6)
|
cfloods, |
Dataframe with floods alsocontaining the date of the flood event |
crain |
Array of rain precipitation for each day for one catchmnents |
csnow |
Array of snow melt for each day for one catchment |
rtime |
Recession time for one station |
Dates |
Dates for or the metdata |
Ctime |
Concentration time of the catchments.Is 2 days for all catchments |
vector with fgp for ecah of the stations.
1 2 |
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.