meta.sub.cor | R Documentation |
Computes the estimate, standard error, and confidence interval for a difference in average Pearson or partial correlations for two mutually exclusive subgroups of studies. Each subgroup can have one or more studies. All of the correlations must be either Pearson correlations or partial correlations.
meta.sub.cor(alpha, n, cor, s, group)
alpha |
alpha level for 1-alpha confidence |
n |
vector of sample sizes |
cor |
vector of estimated correlations |
s |
number of control variables (set to 0 for Pearson) |
group |
vector of group indicators:
|
Returns a matrix with three rows:
Row 1 - estimate for Set A
Row 2 - estimate for Set B
Row 3 - estimate for difference, Set A - Set B
The columns are:
Estimate - estimated average correlation or difference
SE - standard error
LL - lower limit of the confidence interval
UL - upper limit of the confidence interval
Bonett2008avcmeta
n <- c(55, 190, 65, 35)
cor <- c(.40, .65, .60, .45)
group <- c(1, 1, 2, 0)
meta.sub.cor(.05, n, cor, 0, group)
# Should return:
# Estimate SE LL UL
# Set A: 0.525 0.06195298 0.3932082 0.6356531
# Set B: 0.600 0.08128008 0.4171458 0.7361686
# Set A - Set B: -0.075 0.10219894 -0.2645019 0.1387283
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.