plot,report_mig_interannual,missing-method | R Documentation |
Several of these plots are scaled against the same year,i.e.the comparison is based on year 2000, meaning that day 1 would correspond to the first date of 2000, which is also a saturday, the last day of the week.
## S4 method for signature 'report_mig_interannual,missing' plot(x, plot.type = "standard", timesplit = "mois", silent = FALSE)
x |
An object of class report_mig_interannual-class |
plot.type |
Default standard |
timesplit |
Used for plot.type barchart or dotplot, Default mois (month) other possible values are semaine (week), quinzaine (2 weeks), English values within parenthesis are also accepted. |
silent |
Stops displaying the messages.
|
Nothing, called for its side effect of plotting
Cedric Briand cedric.briand@eptb-vilaine.fr
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.