histoProj | R Documentation |
Project a set of curves onto a histogram basis
histoProj(X, t, t.range, breaks)
X |
a matrix |
t |
a matrix of observation times |
t.range |
a range of times in which to place the P projections (default = c(0, 1000)) |
breaks |
the number of intervals in the histogram basis |
X.proj the matrix X after projection
X.count a matrix containing the number of observations used to build the projection onto the histogram basis
windows a vector containing the first time of each window of the histogram intervals
X.max the matrix of minimum values in each window
X.min the matrix of maximum values in each window
Gabrielle Weinrott
res <- drbats.simul(N = 5, P = 100, t.range = c(5, 100), breaks = 8) res.proj <- histoProj(res$X, res$t.simul, t.range = c(5, 100), breaks = 8) res.proj
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.