fCheckHHTimeSeries: fCheckHHTimeSeries

View source: R/DataFunctions.R

fCheckHHTimeSeriesR Documentation

fCheckHHTimeSeries

Description

Check half-hourly time series data

Usage

fCheckHHTimeSeries(Time = Time.V.p, DTS = DTS.n, 
    CallFunction = if (!missing(CallFunction.s)) CallFunction.s else "", 
    Time.V.p, DTS.n, CallFunction.s)

Arguments

Time

Time vector in POSIX format

DTS

Number of daily time steps (24 or 48)

CallFunction
Time.V.p

deprecated

DTS.n

deprecated

CallFunction.s

deprecated

Details

The number of steps per day can be 24 (hourly) or 48 (half-hourly).

The time stamp needs to be provided in POSIX time format,

equidistant half-hours,

and stamped on the half hour.

The sEddyProc procedures require at least three months of data.

Full days of data are preferred: the total amount of data rows should be a multiple of the daily time step, and

in accordance with FLUXNET standards, the dataset is spanning from the end of the first (half-)hour (0:30 or 1:00, respectively) and to midnight (0:00).

Value

Function stops on errors.

Author(s)

AMM Department for Biogeochemical Integration at MPI-BGC, Jena, Germany <REddyProc-help@bgc-jena.mpg.de> [cph], Thomas Wutzler <twutz@bgc-jena.mpg.de> [aut, cre], Markus Reichstein <mreichstein@bgc-jena.mpg.de> [aut], Antje Maria Moffat <antje.moffat@bgc.mpg.de> [aut, trl], Olaf Menzer <omenzer@bgc-jena.mpg.de> [ctb], Mirco Migliavacca <mmiglia@bgc-jena.mpg.de> [aut], Kerstin Sickel <ksickel@bgc-jena.mpg.de> [ctb, trl], Ladislav <U+0160>igut <sigut.l@czechglobe.cz> [ctb]


REddyProc documentation built on March 18, 2022, 5:41 p.m.