%m+% | R Documentation |
Adding months frustrates basic arithmetic because consecutive months have
different lengths. With other elements, it is helpful for arithmetic to
perform automatic roll over. For example, 12:00:00 + 61 seconds becomes
12:01:01. However, people often prefer that this behavior NOT occur with
months. For example, we sometimes want January 31 + 1 month = February 28 and
not March 3. %m+%
performs this type of arithmetic. Date %m+%
months(n)
always returns a date in the nth month after Date. If the new date would
usually spill over into the n + 1th month, %m+%
will return the last day of
the nth month (rollback()
). Date %m-%
months(n) always returns a
date in the nth month before Date.
e1 %m+% e2
add_with_rollback(e1, e2, roll_to_first = FALSE, preserve_hms = TRUE)
e1 |
A period or a date-time object of class POSIXlt, POSIXct or Date. |
e2 |
A period or a date-time object of class POSIXlt, POSIXct or Date. Note that one of e1 and e2 must be a period and the other a date-time object. |
roll_to_first |
rollback to the first day of the month instead of the
last day of the previous month (passed to |
preserve_hms |
retains the same hour, minute, and second information? If
FALSE, the new date will be at 00:00:00 (passed to |
%m+%
and %m-%
handle periods with components less than a month by first
adding/subtracting months and then performing usual arithmetics with smaller
units.
%m+%
and %m-%
should be used with caution as they are not one-to-one
operations and results for either will be sensitive to the order of
operations.
A date-time object of class POSIXlt, POSIXct or Date
jan <- ymd_hms("2010-01-31 03:04:05")
jan + months(1:3) # Feb 31 and April 31 returned as NA
# NA "2010-03-31 03:04:05 UTC" NA
jan %m+% months(1:3) # No rollover
leap <- ymd("2012-02-29")
"2012-02-29 UTC"
leap %m+% years(1)
leap %m+% years(-1)
leap %m-% years(1)
x <- ymd_hms("2019-01-29 01:02:03")
add_with_rollback(x, months(1))
add_with_rollback(x, months(1), preserve_hms = FALSE)
add_with_rollback(x, months(1), roll_to_first = TRUE)
add_with_rollback(x, months(1), roll_to_first = TRUE, preserve_hms = FALSE)
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.