Description Usage Arguments Value
Compute the pseudotime associated to the points over the specified path. Note that the pseudotime of points not associted with any edges of the specified path will be set to NA.
1 | getPseudotime(ProjStruct, NodeSeq)
|
ProjStruct |
A projection structure list as obtained by the project_point_onto_graph function |
NodeSeq |
string, a sequence of nodes that forms a path in the graph. |
a list containing three elements:
Pt: numerical vector, the pseudotime associted with each points in the specified path
PathLen: The total length of the path
NodePos: The pseudotime associated with the of the nodes of the graph
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.