variable_rate_equivalent_time: variable_rate_equivalent_time

Description Usage Arguments Value Author(s) References See Also

View source: R/equivalent_time_utilities.R

Description

Function to calculate the equivalent time required in the variable-rate tests.

Usage

1
variable_rate_equivalent_time(t, s, pump_history)

Arguments

t

Vector with the times since pumping started

s

Vector with the drawdowns since pumping started

pump_history

Vector with the pump history of the test

Value

A list with

Author(s)

Oscar Garcia-Cabrejo khaors@gmail.com

References

Birsoy, Y.K. and W.K. Summers, 1980. Determination of aquifer parameters from step tests and intermittent pumping, Ground Water, vol. 18, no. 2, pp. 137-146.

See Also

Other equivalent_time functions: recovery_equivalent_time


khaors/pumpingtest documentation built on Nov. 15, 2019, 8:10 p.m.