Description Usage Arguments Value Author(s) References See Also
View source: R/equivalent_time_utilities.R
Function to calculate the equivalent time required in the variable-rate tests.
1 | variable_rate_equivalent_time(t, s, pump_history)
|
t |
Vector with the times since pumping started |
s |
Vector with the drawdowns since pumping started |
pump_history |
Vector with the pump history of the test |
A list with
ta equivalent time
sa drawdown corresponding to equivalent time
Oscar Garcia-Cabrejo khaors@gmail.com
Birsoy, Y.K. and W.K. Summers, 1980. Determination of aquifer parameters from step tests and intermittent pumping, Ground Water, vol. 18, no. 2, pp. 137-146.
Other equivalent_time functions: recovery_equivalent_time
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.