network_cof_ehv_fittings: Network cost of Failure for EHV/132kV Fittings

View source: R/cof_ehv_fittings.R

network_cof_ehv_fittingsR Documentation

Network cost of Failure for EHV/132kV Fittings

Description

This function calculates network cost of failure for EHV fittings (cf. section 7.6, page 87, CNAIM, 2021). Network cost of failure is used in the derivation of consequences of failure see cof().

Usage

network_cof_ehv_fittings(ehv_asset_category, actual_load_mva, secure = T)

Arguments

ehv_asset_category

String The type of EHV asset category Options: ehv_asset_category = c("33kV Fittings", "66kV Fittings", "132kV Fittings")

actual_load_mva

Numeric. The actual load on the asset

secure

Boolean If the asset is in a secure network or not

Value

Numeric. Network cost of failure.

Source

DNO Common Network Asset Indices Methodology (CNAIM), Health & Criticality - Version 2.1, 2021: https://www.ofgem.gov.uk/sites/default/files/docs/2021/04/dno_common_network_asset_indices_methodology_v2.1_final_01-04-2021.pdf

Examples

network_cof_ehv_fittings(ehv_asset_category = "33kV Fittings",
actual_load_mva = 15)

CNAIM documentation built on Aug. 31, 2022, 9:13 a.m.