View source: R/cof_sub_cables.R
network_cof_hv_sub_cables | R Documentation |
This function calculates network cost of failure for
Sub cables
(cf. section 7.6, page 87, CNAIM, 2021). Network cost of failure
is used in the derivation of consequences of failure see cof
().
network_cof_hv_sub_cables( sub_cable_asset_category, no_customers, kva_per_customer = "Default" )
sub_cable_asset_category |
String The type of Submarine cable asset category
Option: |
no_customers |
Numeric. The number of customers fed by an individual asset. |
kva_per_customer |
Numeric. If the asset have an exceptionally high
demand per customer type in kVA per customer. A setting of |
Numeric. Network cost of failure.
DNO Common Network Asset Indices Methodology (CNAIM), Health & Criticality - Version 2.1, 2021: https://www.ofgem.gov.uk/sites/default/files/docs/2021/04/dno_common_network_asset_indices_methodology_v2.1_final_01-04-2021.pdf
network_cof_hv_sub_cables(sub_cable_asset_category = "HV Sub Cable", no_customers = 750, kva_per_customer = 51)
Add the following code to your website.