safety_cof_board_04kv: Safety cost of Failure for 0.4kV Board

View source: R/cof_board_04kv.R

safety_cof_board_04kvR Documentation

Safety cost of Failure for 0.4kV Board

Description

This function calculates safety consequences of failure (cf. section 7.3, page 79, CNAIM, 2021). Safety consequences of failure is used in the derivation of consequences of failure see cof(). Outputted in (DKK).

Usage

safety_cof_board_04kv(location_risk, type_risk)

Arguments

location_risk

String Type Financial factor criteria for 0.4kV board (cf. section D1.2.1, page 178, CNAIM, 2021). Options: location_risk = c("Low", "Medium", "High"). The default setting is location_risk = "Medium".

type_risk

String. Asses Financial factor criteria for 0.4kV board setting (cf. table 221, page 180, CNAIM, 2021). Options: type_risk = c("Low", "Medium", "High"). The default setting is type_risk = "Medium".

Value

Numeric. Financial consequences of failure for 0.4kV board

Source

DNO Common Network Asset Indices Methodology (CNAIM), Health & Criticality - Version 2.1, 2021: https://www.ofgem.gov.uk/sites/default/files/docs/2021/04/dno_common_network_asset_indices_methodology_v2.1_final_01-04-2021.pdf

Examples

safety_cof_board_04kv(
location_risk = "Default",
type_risk = "Default")

CNAIM documentation built on Aug. 31, 2022, 9:13 a.m.