safety_cof_pillar_04kv: Safety cost of Failure for 0.4kV Pillar

View source: R/cof_pillar_04kv.R

safety_cof_pillar_04kvR Documentation

Safety cost of Failure for 0.4kV Pillar

Description

This function calculates safety consequences of failure (cf. section 7.3, page 79, CNAIM, 2021). Safety consequences of failure is used in the derivation of consequences of failure see cof(). Outputted in DKK

Usage

safety_cof_pillar_04kv(location_risk, type_risk)

Arguments

location_risk

String Type Financial factor criteria for 0.4kV Pillar (cf. section D1.2.1, page 178, CNAIM, 2021). Options: location_risk = c("Low", "Medium", "High"). The default setting is location_risk = "Medium".

type_risk

String. Asses Financial factor criteria for 0.4kV Pillar setting (cf. table 221, page 180, CNAIM, 2021). Options: type_risk = c("Low", "Medium", "High"). The default setting is type_risk = "Medium".

Value

Numeric. Financial consequences of failure for 0.4kV Pillar

Source

DNO Common Network Asset Indices Methodology (CNAIM), Health & Criticality - Version 2.1, 2021: https://www.ofgem.gov.uk/sites/default/files/docs/2021/04/dno_common_network_asset_indices_methodology_v2.1_final_01-04-2021.pdf

Examples

safety_cof_pillar_04kv(
location_risk = "Default",
type_risk = "Default")

CNAIM documentation built on Aug. 31, 2022, 9:13 a.m.