prep_pbar | R Documentation |
prep_pbar
creates and update_pbar
steps
through the progress bars (if desired) in TS
prep_pbar(control = list(), bar_type = "rho", nr = NULL)
update_pbar(pbar, control = list())
control |
A |
bar_type |
"rho" (for change point locations) or "eta" (for regressors). |
nr |
|
pbar |
The progress bar object returned from |
prep_pbar
: the initialized progress bar object.
update_pbar
: the ticked-forward pbar
.
pb <- prep_pbar(control = list(nit = 2)); pb
pb <- update_pbar(pb); pb
pb <- update_pbar(pb); pb
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.