prep_proposal_dist: Pre-calculate the change point proposal distribution for the...

Description Usage Arguments Value Examples

View source: R/ptMCMC.R

Description

Calculate the proposal distribution in advance of actually running the ptMCMC algorithm in order to decrease computation time. The proposal distribution is a joint of three distributions: [1] a multinomial distribution selecting among the change points within the chain, [2] a binomial distribution selecting the direction of the step of the change point (earlier or later in the time series), and [3] a geometric distribution selecting the magnitude of the step.

Usage

1
prep_proposal_dist(nchangepoints, control = list())

Arguments

nchangepoints

Integer corresponding to the number of change points to include in the model. 0 is a valid input (corresponding to no change points, so a singular time series model), and the current implementation can reasonably include up to 6 change points. The number of change points is used to dictate the segmentation of the data for each continuous model and each LDA model.

control

A list of parameters to control the fitting of the Time Series model including the parallel tempering Markov Chain Monte Carlo (ptMCMC) controls. Values not input assume defaults set by TS_control. Currently relevant here is magnitude, which controls the magnitude of the step size (is the average of the geometric distribution).

Value

list of two matrix elements: [1] the size of the proposed step for each iteration of each chain and [2] the identity of the change point location to be shifted by the step for each iteration of each chain.

Examples

1
  prep_proposal_dist(nchangepoints = 2)

weecology/LDATS documentation built on March 28, 2020, 11:20 a.m.