PlotlengthSIM: Plots the sum of length using calculated using simulation

View source: R/328.Sum_Leng_GENERAL_SIM.R

PlotlengthSIMR Documentation

Plots the sum of length using calculated using simulation

Description

Plots the sum of length using calculated using simulation

Usage

PlotlengthSIM(n, LL, UL, s, a, b)

Arguments

n

- Number of trials

LL

- Lower limit

UL

- Upper limit

s

- Number of Hypothetical "p"

a

- Beta parameters for hypo "p"

b

- Beta parameters for hypo "p"

Details

The plot of the expected length for n given lower limit LL and upper limit UL

See Also

Other Expected length: PlotexplGEN(), PlotexplSIM(), PlotlengthGEN(), lengthGEN(), lengthSIM()

Examples

LL=c(0,0.01,0.0734,0.18237,0.3344,0.5492)		#Lower and Upper Limits
UL=c(0.4507,0.6655,0.8176,0.9265,0.9899,1)
n= 5; s=5000; a=1; b=1;
PlotlengthSIM(n,LL,UL,s,a,b)

RajeswaranV/proportion documentation built on June 17, 2022, 9:11 a.m.