PlotpCOpBIEX: Plots of p-confidence and p-bias of Exact method given n and...

View source: R/402.p-Confidence_p-Bias_BASE_All_Graph.R

PlotpCOpBIEXR Documentation

Plots of p-confidence and p-bias of Exact method given n and alpha level

Description

Plots of p-confidence and p-bias of Exact method given n and alpha level

Usage

PlotpCOpBIEX(n, alp, e)

Arguments

n

- Number of trials

alp

- Alpha value (significance level required)

e

- Exact method indicator in [0, 1] 1: Clopper Pearson, 0.5: Mid P The input can also be a range of values between 0 and 1.

Details

Evaluation of Confidence interval for p based on inverting equal-tailed binomial tests with null hypothesis H0: p = p0 using p-confidence and p-bias for the n + 1 intervals

Value

A dataframe with

x1

Number of successes (positive samples)

pconf

p-Confidence

pbias

p-Bias

References

[1] 2005 Vos PW and Hudson S. Evaluation Criteria for Discrete Confidence Intervals: Beyond Coverage and Length. The American Statistician: 59; 137 - 142.

See Also

Other p-confidence and p-bias of base methods: PlotpCOpBIAS(), PlotpCOpBIAll(), PlotpCOpBIBA(), PlotpCOpBILR(), PlotpCOpBILT(), PlotpCOpBISC(), PlotpCOpBITW(), PlotpCOpBIWD(), pCOpBIAS(), pCOpBIAll(), pCOpBIBA(), pCOpBIEX(), pCOpBILR(), pCOpBILT(), pCOpBISC(), pCOpBITW(), pCOpBIWD()

Examples

n=5; alp=0.05;e=0.5; # Mid-p
PlotpCOpBIEX(n,alp,e)
n=5; alp=0.05;e=1; #Clopper-Pearson
PlotpCOpBIEX(n,alp,e)
n=5; alp=0.05;e=c(0.1,0.5,0.95,1); #Range including Mid-p and Clopper-Pearson
PlotpCOpBIEX(n,alp,e)

RajeswaranV/proportion documentation built on June 17, 2022, 9:11 a.m.