Monthly entries for cooling of electricity generation plants over the years 2012-2020. From EIA Form 923, Schedule 8.
YearMonthPlantIDEIA-assigned plant code
CoolingIDCooling system identification number
CoolingTypeTypes of cooling systems:
| Code | Description |
| DC | Dry (air) cooling system |
| HRC | Hybrid: cooling pond(s) or canal(s) with dry cooling |
| HRF | Hybrid: forced draft cooling tower(s) with dry cooling |
| HRI | Hybrid: induced draft cooling tower(s) with dry cooling |
| OC | Once through with cooling pond(s) |
| ON | Once through without cooling pond(s) |
| RC | Recirculating with cooling pond(s) or canal(s) |
| RF | Recirculating with forced draft cooling tower(s) |
| RI | Recirculating with induced draft cooling tower(s) |
| RN | Recirculating with natural draft cooling tower(s) |
| HT | Helper Tower |
| OT | Other (specify in SCHEDULE 7) |
CoolingStatusCooling system status:
| Code | Description |
| CN | Cancelled (previously reported as “planned”) |
| CO | New unit under construction |
| OP | Operating (in commercial service or out of service less than 365 days) |
| OS | Out of service (365 days or longer) |
| PL | Planned (expected to go into commercial service within 10 years) |
| RE | Retired (no longer in service and not expected to be returned to service) |
| SB | Standby (or inactive reserve); i.e., not normally used, but available for service |
| SC | Cold Standby (Reserve); deactivated (usually requires 3 to 6 months to reactivate) |
| TS | Operating under test conditions (not in commercial service) |
HoursInServiceChlorine (thousand lbs)Diversion (gpm)Withdrawal (gpm)Discharge (gpm)Consumption (gpm)FlowMethodIntakeAvgTemp (F)IntakeMaxTempDischargeAvgTempDischargeMaxTempTempMethodDiversion (MGal)Withdrawal (MGal)Discharge (MGal)Consumption (MGal)cooling
A dataframe with 149285 rows and 21 columns.