| plants | R Documentation |
Annual entries for electric power generation plants in EIA form 860 over the years 2013-2020.
Utility ID, Utility NameUnique identification codes and names of the electricity utilities.
Plant Code, Plant NameEIA-assigned plant code
CountyCounty Name
,
Latitude, LongitudePhysical location of each plant, including address and geographic coordinates.
NERC RegionNorth American Electric Reliability Corporation (NERC)region in which the plant operates
Balancing Authority CodeA 5-character code for the balancing authority managing supply, demand, and interchanges within an electrically defined area. May or may not be the same as the Owner of Transmission/Distribution Facilities.
Balancing Authority NameName of Balancing Authority
Name of Water SourceThe name of the principal source from which cooling water or water for generating power for hydroelectric plants is obtained. If #'water is from an underground aquifer, provide name of aquifer, if known. If name of 'aquifer is not known, “Wells.” “Municipality” if the water is from a municipality. “UNK” for planned facilities for which the water source is not known. “NA” for plants that do not use a water source for cooling or hydroelectric generation.
Primary Purpose (NAICS Code)North American Industry Classification System (NAICS) code 'that best describes the primary purpose of the plant.Electric utility plants and independent power producers whose primary purpose is generating electricity for sale will generally use code 22. For generators whose primary business is an industrial or commercial process (e.g., paper mills, refineries, chemical plants, etc.) and for which generating electricity is a secondary purpose, use a code other than 22.
Regulatory StatusIndicates whether the plant is regulated (RE) or non-regulated (NR)
SectorPlant-level sector name, designated by the primary purpose, regulatory status and plant-level combined heat and power status.Options include Commercial, Electric Utility, Industrial, Non-CHP Independent Power Producer (IPP), CHP IPP.
Sector NamePlant-level sector number, designated by the primary purpose, regulatory status and plant-level combined heat and power status, "1 = Electric Utility , 2 = Independent Power Producer, Non-Combined Heat and Power, 3 = Independent Power Producer, Combined Heat and Power, 4 = Commercial, Non-Combined Heat and Power, 5 = Commercial, Combined Heat and Power, 6 = Industrial, Non-Combined Heat and Power, 7 = Industrial, Combined Heat and Power"
Net Metering (for facilities with solar and wind generation)desc
FERC Cogeneration StatusIndicates of whether the plant has FERC qualifying facility cogenerator status.Yes , No
FERC Cogeneration Docket NumberThe docket number relating to the FERC qualifying facility cogenerator status
FERC Small Power Producer StatusIndicates of whether the plant has FERC qualifying facility small power producer status
FERC Small Power Producer Docket NumberThe docket number relating to the FERC qualifying facility small power producer status
FERC Exempt Wholesale Generator StatusIndicates of whether the plant has FERC qualifying facility exempt wholesale generator status
FERC Exempt Wholesale Generator Docket NumberThe docket number relating to the FERC qualifying facility exempt wholesale generator status
Ash Impoundment?Is there an ash impoundment (e.g. pond, reservoir) at the plant?
Ash Impoundment Lined?If there is an ash impoundment at the plant, is the impoundment lined?
Ash Impoundment StatusIf there is an ash impoundment at the plant, the ash impoundment status as of December 31 of the reporting year
Transmission or Distribution System OwnerName of the owner of the transmission or distribution system to which the plant is interconnected
Transmission or Distribution System Owner IDEIA-assigned code for owner of transmission/distribution system to which the plant is interconnected
Transmission or Distribution System Owner StateState location for owner of transmission/distribution system to which the plant is interconnected
Grid Voltage (kV)Plant's grid voltage at point of interconnection to transmission or distibution facilities. If the plant is interconnected to more than three transmission / distriubtion facilites, the three highest grid voltages are reported
Grid Voltage 2 (kV)Plant's grid voltage at point of interconnection to transmission or distibution facilities. If the plant is interconnected to more than three transmission / distriubtion facilites, the three highest grid voltages are reported
Grid Voltage 3 (kV)Plant's grid voltage at point of interconnection to transmission or distibution facilities
Plant's grid voltage at point of interconnection to transmission or distibution facilities. If the plant is interconnected to more than three transmission / distriubtion facilites, the three highest grid voltages are reported
Natural Gas Pipeline Namedesc
Year2013 to 2019
Energy StorageIndicates if the facility have energy storage capabilities
Natural Gas LDC NameNames of Local Distribution Company (LDC), connected to natural gas burning power plants
Natural Gas Pipeline Name 1The name of the owner or operator of natural gas pipeline that connects directly to this facility or that connects to a lateral pipeline owned by this facility
Natural Gas Pipeline Name 2The name of the owner or operator of natural gas pipeline that connects directly to this facility or that connects to a lateral pipeline owned by this facility
Natural Gas Pipeline Name 3The name of the owner or operator of natural gas pipeline that connects directly to this facility or that connects to a lateral pipeline owned by this facility
Pipeline NotesAdditional owner or operator of natural gas pipeline
Natural Gas StorageIndicates if the facility have on-site storage of natural gas
Liquified Natural Gas StorageIndicates if the facility have the capability to store the natural gas in the form of liquefied natural gas
plants
A dataframe with 80641 rows and 45 columns.
Add the following code to your website.