tgrid | R Documentation |
simtime objects allow the user to specify simulation start and end times, along with the simulation time step.
tgrid(
start = 0,
end = 24,
delta = 1,
add = numeric(0),
.offset = 0,
.scale = 1,
...
)
## S4 method for signature 'tgrid'
stime(x, ...)
## S4 method for signature 'tgrids'
stime(x, ...)
## S4 method for signature 'numeric'
stime(x, ...)
## S4 method for signature 'tgrid'
show(object)
## S4 method for signature 'tgrids'
show(object)
## S4 method for signature 'mrgmod'
stime(x, ...)
start |
simulation start time |
end |
simulation end time |
delta |
simulation time step |
add |
addition simulation times |
.offset |
the resulting set of times will be adjusted by this amount |
.scale |
the resulting set of times will be scaled by this factor |
... |
passed on to other methods |
x |
tgrid object |
object |
passed to show |
peak <- tgrid(0,6,0.2)
sparse <- tgrid(0,24,4)
day1 <- c(peak,sparse)
design <- c(day1, day1+72, day1+240)
## Not run:
mod <- mrgsolve::house()
out <- mod %>% ev(amt=1000, ii=24, addl=10) %>% mrgsim(tgrid=design)
plot(out,CP~., type='b')
## End(Not run)
Add the following code to your website.
For more information on customizing the embed code, read Embedding Snippets.