Simp: Simulated Chim (Simp) Data

SimpR Documentation

Simulated Chim (Simp) Data

Description

This is a simulated movement track from a continuous auto-correlated process of total duration 60 time units with four behavioral phases that switch at times T=10, 20 and 50 from, variously, higher or lower velocity and longer or shorter characteristic time scale of autocorrelation. The original data was simulated with time intervals of 0.01 (leading to a complete track with 6000 data points). 200 points were randomly sampled from the "true" movement track, such that the intervals between locations are random with mean interval 0.3 units.

Usage

data(Simp)

Format

Time

times of observation

X, Y

coordinates

Source

simulated data

Examples

data(Simp)
plot(Simp)

bcpa documentation built on May 30, 2022, 5:07 p.m.