R/add_constraint_budget.R

Defines functions add_constraint_budget

Documented in add_constraint_budget

#' @include internal.R
#'
#' @title Add budget constraint
#'
#' @description
#' Add a budget constraint to a planning problem.
#'
#' This function stores one budget-constraint specification in the
#' \code{Problem} object so that it can later be incorporated when the
#' optimization model is assembled. Multiple budget constraints can be added by
#' calling this function repeatedly, provided that no duplicated combination of
#' action subset and constraint sense is introduced.
#'
#' @details
#' Calls accumulate constraints for distinct action scopes, cost components,
#' or senses. Repeating the same combination raises an error, even with a
#' different threshold or name. To change it, rebuild from the problem before
#' the constraint was added.
#' Explicit names must be unique within the budget-constraint family; omitted
#' names are generated automatically.
#'
#' Use this function when spending limits or minimum spending requirements must
#' be imposed either on the full problem or on the subset of selected decisions
#' associated with specific actions.
#'
#' Let \eqn{\mathcal{I}} denote the set of planning units and let
#' \eqn{\mathcal{A}} denote the set of actions. Let
#' \eqn{w_i \in \{0,1\}} denote the binary variable indicating whether planning
#' unit \eqn{i \in \mathcal{I}} is selected by at least one decision in the
#' model, and let \eqn{x_{ia} \in \{0,1\}} denote the binary variable
#' indicating whether action \eqn{a \in \mathcal{A}} is selected in planning
#' unit \eqn{i \in \mathcal{I}}.
#'
#' The total constrained budget can include two cost components:
#'
#' \itemize{
#'   \item planning-unit costs, associated with \eqn{w_i};
#'   \item action costs, associated with \eqn{x_{ia}}.
#' }
#'
#' The arguments \code{include_pu_cost} and \code{include_action_cost}
#' determine which of these components are included in the stored budget
#' constraint.
#'
#' When \code{actions = NULL}, the constraint refers to the total budget across
#' the whole problem. In that case, depending on the values of
#' \code{include_pu_cost} and \code{include_action_cost}, the constrained
#' quantity is one of the following:
#'
#' If only planning-unit costs are included:
#' \deqn{
#' \sum_{i \in \mathcal{I}} c_i^{pu} w_i
#' }
#'
#' If only action costs are included:
#' \deqn{
#' \sum_{i \in \mathcal{I}} \sum_{a \in \mathcal{A}} c_{ia}^{act} x_{ia}
#' }
#'
#' If both components are included:
#' \deqn{
#' \sum_{i \in \mathcal{I}} c_i^{pu} w_i +
#' \sum_{i \in \mathcal{I}} \sum_{a \in \mathcal{A}} c_{ia}^{act} x_{ia}
#' }
#'
#' Depending on \code{sense}, this function stores one of the following
#' constraints:
#'
#' If \code{sense = "min"}:
#' \deqn{
#' C \ge B
#' }
#'
#' If \code{sense = "max"}:
#' \deqn{
#' C \le B
#' }
#'
#' If \code{sense = "equal"} and \code{tolerance = 0}:
#' \deqn{
#' C = B
#' }
#'
#' If \code{sense = "equal"} and \code{tolerance > 0}, the equality is stored as
#' a two-sided band:
#' \deqn{
#' B - \tau \le C \le B + \tau
#' }
#'
#' where \eqn{C} denotes the selected cost expression and \eqn{\tau} is the
#' value supplied through \code{tolerance}.
#'
#' When \code{actions} is not \code{NULL}, only action costs can be included.
#' In that case, let \eqn{\mathcal{A}^\star \subseteq \mathcal{A}} denote the
#' selected subset of actions, and the constrained quantity is
#' \deqn{
#' \sum_{i \in \mathcal{I}} \sum_{a \in \mathcal{A}^\star} c_{ia}^{act} x_{ia}.
#' }
#'
#' Action-specific budget constraints only support action costs. Therefore,
#' \code{include_pu_cost = TRUE} is only allowed when \code{actions = NULL},
#' because planning-unit costs are not action-specific.
#'
#' This function only stores the constraint specification; it does not validate
#' the feasibility of the threshold against the available cost data at this
#' stage.
#'
#' Multiple budget constraints can be stored in a \code{Problem} object.
#' However, at most one can be stored for the same combination of action subset
#' and constraint sense. Attempting to add a duplicated
#' \code{actions}--\code{sense} combination results in an error.
#'
#' @param x A \code{Problem} object.
#'
#' @param budget Numeric scalar greater than or equal to zero. Target value for
#'   the constrained budget.
#'
#' @param sense Character string indicating the type of budget constraint. Must
#'   be one of \code{"min"}, \code{"max"}, or \code{"equal"}.
#'
#' @param tolerance Numeric scalar greater than or equal to zero. Only used when
#'   \code{sense = "equal"}. In that case, equality is interpreted as a band
#'   around \code{budget} with half-width \code{tolerance}. Ignored otherwise.
#'
#' @param actions Optional subset of actions to which the constraint applies.
#'   If \code{NULL}, the constraint applies to the whole problem. Otherwise, it
#'   applies only to the selected decision variables associated with the
#'   specified subset of actions. This argument is resolved using the package's
#'   standard action subset parser.
#'
#' @param include_pu_cost Logical scalar indicating whether planning-unit costs
#'   should be included in the constrained budget. This is only supported when
#'   \code{actions = NULL}.
#'
#' @param include_action_cost Logical scalar indicating whether action costs
#'   should be included in the constrained budget.
#'
#' @param name Optional character string used as the label of the stored linear
#'   constraint when it is later added to the optimization model. If
#'   \code{NULL}, a default name is generated.
#'
#' @return An updated \code{Problem} object with the new budget-constraint
#'   specification appended to the stored budget-constraint table.
#'
#' @seealso
#' \code{\link{create_problem}}
#'
#' @examples
#' # Load a complete simulated planning problem.
#' example_data <- load_sim_multiaction()
#'
#' p <- create_problem(
#'   pu = example_data$planning_units,
#'   features = example_data$features,
#'   dist_features = example_data$dist_features,
#'   cost = "cost"
#' ) |>
#'   add_actions(
#'     example_data$actions,
#'     cost = example_data$action_costs
#'   )
#'
#' p <- add_constraint_budget(
#'   x = p,
#'   budget = 10,
#'   sense = "max",
#'   include_pu_cost = TRUE,
#'   include_action_cost = TRUE
#' )
#'
#' p <- add_constraint_budget(
#'   x = p,
#'   budget = 4,
#'   sense = "max",
#'   actions = "restore",
#'   include_pu_cost = FALSE,
#'   include_action_cost = TRUE
#' )
#'
#' p <- add_constraint_budget(
#'   x = p,
#'   budget = 1,
#'   sense = "min",
#'   actions = "restore",
#'   include_pu_cost = FALSE,
#'   include_action_cost = TRUE
#' )
#'
#' p$data$constraints$budget
#'
#' @export
add_constraint_budget <- function(x,
                                  budget,
                                  sense,
                                  tolerance = 0,
                                  actions = NULL,
                                  include_pu_cost = TRUE,
                                  include_action_cost = TRUE,
                                  name = NULL) {

  stopifnot(inherits(x, "Problem"))

  if (missing(sense) || is.null(sense)) {
    stop(
      "`sense` must be explicitly provided. Use one of: 'min', 'max', or 'equal'.",
      call. = FALSE
    )
  }

  sense <- match.arg(sense, c("min", "max", "equal"))

  assertthat::assert_that(
    assertthat::is.number(budget),
    is.finite(budget),
    budget >= 0
  )

  assertthat::assert_that(
    assertthat::is.number(tolerance),
    is.finite(tolerance),
    tolerance >= 0
  )

  assertthat::assert_that(
    is.logical(include_pu_cost),
    length(include_pu_cost) == 1,
    !is.na(include_pu_cost)
  )

  assertthat::assert_that(
    is.logical(include_action_cost),
    length(include_action_cost) == 1,
    !is.na(include_action_cost)
  )

  if (!include_pu_cost && !include_action_cost) {
    stop(
      "At least one of `include_pu_cost` or `include_action_cost` must be TRUE.",
      call. = FALSE
    )
  }

  if (!is.null(actions) && isTRUE(include_pu_cost)) {
    stop(
      "`include_pu_cost = TRUE` is only supported when `actions = NULL`, because planning-unit costs are not action-specific.",
      call. = FALSE
    )
  }

  if (!is.null(name)) {
    if (!is.character(name) || length(name) != 1 || is.na(name) || !nzchar(name)) {
      stop("`name` must be NULL or a non-empty character string.", call. = FALSE)
    }
  }

  if (sense != "equal" && tolerance > 0) {
    warning(
      "`tolerance` is only used when sense = 'equal'. It will be ignored.",
      call. = FALSE,
      immediate. = TRUE
    )
  }

  x <- .pa_clone_data(x)

  actions_txt <- NA_character_

  if (!is.null(actions)) {
    act_subset <- .pa_resolve_action_subset(x, subset = actions)

    if (!is.data.frame(act_subset) || nrow(act_subset) == 0) {
      stop("`actions` did not resolve to any valid actions.", call. = FALSE)
    }

    actions_txt <- .pa_subset_to_string(act_subset$id)
  }

  budget_name <- if (is.null(name)) {
    prefix <- if (isTRUE(include_pu_cost) && isTRUE(include_action_cost)) {
      "budget_total"
    } else if (isTRUE(include_pu_cost)) {
      "budget_pu"
    } else {
      "budget_action"
    }

    if (is.na(actions_txt)) {
      paste0(prefix, "_", sense)
    } else {
      paste0(prefix, "_", sense, "_", gsub("\\|", "_", actions_txt))
    }
  } else {
    as.character(name)[1]
  }

  budget_name <- .pa_constraint_name(x, "budget", budget_name, explicit = !is.null(name))

  budget_df <- data.frame(
    type = "budget",
    sense = sense,
    value = as.numeric(budget),
    tolerance = if (sense == "equal") as.numeric(tolerance) else 0,
    actions = actions_txt,
    include_pu_cost = include_pu_cost,
    include_action_cost = include_action_cost,
    name = budget_name,
    stringsAsFactors = FALSE
  )

  x <- .pa_store_budget_constraints(x, budget_df)

  if (!is.null(x$data$model_ptr)) {
    x$data$meta <- x$data$meta %||% list()
    x$data$meta$model_dirty <- TRUE
  }

  x
}

Try the multiscape package in your browser

Any scripts or data that you put into this service are public.

multiscape documentation built on Oct. 12, 2026, 5:08 p.m.