Nothing
gap
parameter
for the add_rsymphony_solver
and add_lpsymphony_solver
corresponded to the
maximum absolute difference from the optimal objective value.
This was an error due to misunderstanding the SYMPHONY documentation.
Under previous versions of the package, the gap
parameter actually
corresponded to a relative optimality gap expressed
as a percentage (such thatgap = 10
indicates that solutions must be at
least 10% from optimality). We have now fixed this error and the documentation
described for the gap
parameter is correct. We apologize for any
inconvenience this may have caused.add_rsymphony_solver
and add_lpsymphony_solver
functions to have
a default time_limit
argument set as the maximum machine integer for
consistency.add_rsymphony_solver
, add_lpsymphony_solver
, and
add_gurobi_solver
functions to require logical
(TRUE
/FALSE
) arguments
for the first_feasible
parameter.\dontrun
instead of \donttest
per CRAN policies.tibble::as.tibble
with tibble::as_tibble
to avoid warnings.add_heuristic_solver
to skip initial step for removing
projects and actions that exceed the budget. While this initial step
improves solution quality, it is not conventionally used in project
prioritization algorithms and so should be omitted to provide accurate
benchmarks.add_max_phylo_div_objective
). Specifically, 1'000 points instead of 10'000
points are now used for piece-wise linear components. It appears that
reducing the precision in this manner does not affect the correctness of
results, but substantially reduces the time needed to solve problems to
optimality in certain situations.add_heuristic_solver
algorithm so that cost-effectiveness values
are calculated with projects sharing costs (e.g. if two projects share an
action that costs $100, then this action contributes $50 to the cost of each
project). This update makes the algorithm similar to backwards heuristics
conventionally used in prioritizing species recovery projects (i.e.
https://github.com/p-robot/ppp; #14).add_heuristic_solver
function introduced in version 0.0.0.15.add_heuristic_solver
algorithm so that it removes projects, and
not actions, in an iterative fashion. This update (i) makes the algorithm
comparable to the backwards heuristics conventionally used in prioritizing
species recovery projects (i.e. https://github.com/p-robot/ppp) and (ii)
substantially reduces run time (#14).add_heuristic_solver
and add_random_solver
arising from
floating point comparison issue. These were causing infeasible solutions to
be returned in R version 3.4.4.project_cost_effectiveness
reporting incorrect costs, and
cost-effectiveness values.add_heuristic_solver
algorithm so that all actions and projects which
exceed the budget are automatically removed prior to the iterative action
removal.add_random_solver
algorithms so that projects are selected instead
of individual actions. This means that solutions from this solver are (i)
similar to those in previous project prioritization studies and (ii) more
likely to deliver better solutions (#13).replacement_costs
yielding incorrect results for baseline
projects when used with SYMPHONY solvers.project_cost_effectiveness
function to calculate the
cost-effectiveness for each conservation project in a problem.solution_statistics
function outputs which projects are completely
funded in each solution (#9).Found more than one class "tbl_df" in cache; using the first, from namespace 'tibble'
" text.add_max_phylo_div_objective
yielding incorrect solutions
when features are ordered differently in the phylogenetic and tabular input
data.solution_statistics
yielding objective values for
phylogenetic problems when features are ordered differently in the
phylogenetic and tabular input data.return_data
argument to plot_feature_persistence
and
plot_phylo_persistence
so that plotting data can be obtained
for creating custom plots.add_relative_targets
and add_manual_targets
(when relative
targets supplied) calculations. This result in incorrect calculations.add_gurobi_solver
function) now uses
NumericFocus=3
to help avoid numerical issues.compile
function now throws a warning if problems are likely to
have numerical issues.problem
. It will now throw
descriptive error messages if features are missing baseline probabilities, or
are associated with baseline probabilities below 1e-11.simulate_ptm_data
that had a very small chance of failing
due to simulating a data set where an action is not associated with any
project.simulate_ppp_data
and
simulate_ptm_data